{"id":51,"date":"2026-09-04T23:09:12","date_gmt":"2026-09-04T21:09:12","guid":{"rendered":"http:\/\/nowa.masad.pl\/jak-skutecznie-wdrazac-standardy-ochrony-srodowiska\/"},"modified":"2026-10-25T01:05:34","modified_gmt":"2026-10-24T23:05:34","slug":"karta-informacyjna-przedsiewziecia-kip","status":"publish","type":"post","link":"https:\/\/masad.pl\/en\/karta-informacyjna-przedsiewziecia-kip\/","title":{"rendered":"Project Information Sheet (KIP) \u2013 when is it required and how should it be prepared?"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The Project Information Sheet is one of the most important documents at the initial stage of an investment process. On its basis, the competent authority assesses whether the planned project requires a full environmental impact assessment and the preparation of an EIA report. A well-prepared KIP can reduce the risk of requests for supplementary documentation, delays, and changes to the project schedule.<\/p>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">If you need a Project Information Sheet (KIP) prepared for a specific investment project, see our <a href=\"https:\/\/masad.pl\/en\/kip-dokumentacja-srodowiskowa\/\" data-type=\"page\" data-id=\"541\">KIP preparation service.<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading ext-animate--on\">What is a Project Information Sheet?<\/h2>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">A Project Information Sheet, commonly referred to by the Polish abbreviation KIP, is a document containing the basic information about a planned investment project and its potential impact on the environment. It is a key attachment to an application for an environmental decision for projects that may potentially have a significant impact on the environment.<\/p>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">Based on the KIP and the opinions of the competent consulting authorities, the authority conducting the proceedings decides whether an environmental impact assessment will be required for the project and, consequently, whether a detailed EIA report must be prepared.<\/p>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">The KIP should therefore not be treated as a short form or merely a formal attachment. Its content may determine the further course of the environmental procedure, the scope of additional analyses, and the time required to obtain the decision.<\/p>\n\n\n\n<h2 class=\"wp-block-heading ext-animate--on\">When is a Project Information Sheet required?<\/h2>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">As a general rule, a Project Information Sheet is submitted as part of the procedure concerning a project that may potentially have a significant impact on the environment. The types of such projects are specified in the Regulation of the Council of Ministers on projects that may have a significant impact on the environment.<\/p>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">Depending on their parameters, location and scale, this group may include, among others:<\/p>\n\n\n\n<ul class=\"wp-block-list ext-animate--on\">\n<li class=\"ext-animate--on\">industrial, production and warehouse facilities,<\/li>\n\n\n\n<li class=\"ext-animate--on\">installations related to waste management,<\/li>\n\n\n\n<li class=\"ext-animate--on\">road, railway, port and hydrotechnical projects,<\/li>\n\n\n\n<li class=\"ext-animate--on\">energy projects and transmission infrastructure,<\/li>\n\n\n\n<li class=\"ext-animate--on\">water and wastewater installations,<\/li>\n\n\n\n<li class=\"ext-animate--on\">service, residential or tourist developments meeting specified parameters,<\/li>\n\n\n\n<li class=\"ext-animate--on\">extensions or changes in the use of an existing facility.<\/li>\n<\/ul>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">The name of the investment alone is not sufficient for its correct classification. The thresholds specified in the regulations, the interrelationships between individual elements of the project, the potential for cumulative impacts, and the location of the investment are also important \u2014 particularly in relation to protected areas and residential development.<\/p>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">Therefore, the legal and environmental classification should be carried out as early as the concept stage, before the technical solutions or implementation schedule are finalised.<\/p>\n\n\n\n<h2 class=\"wp-block-heading ext-animate--on\">What should a properly prepared KIP contain?<\/h2>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">The scope of the Project Information Sheet is defined by Article 62a of the Act on Access to Information on the Environment and its Protection. The document should present the project in a specific and coherent manner, enabling the competent authority to assess the type and scale of its potential impacts.<\/p>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">In practice, a KIP should include in particular:<\/p>\n\n\n\n<ul class=\"wp-block-list ext-animate--on\">\n<li class=\"ext-animate--on\">the type, characteristics, scale and location of the project,<\/li>\n\n\n\n<li class=\"ext-animate--on\">the area occupied by the property and the existing manner in which it is used,<\/li>\n\n\n\n<li class=\"ext-animate--on\">a description of the technology and key processes,<\/li>\n\n\n\n<li class=\"ext-animate--on\">the expected consumption of water, raw materials, fuels and energy,<\/li>\n\n\n\n<li class=\"ext-animate--on\">environmental protection measures,<\/li>\n\n\n\n<li class=\"ext-animate--on\">the types and expected quantities of emissions, wastewater and waste,<\/li>\n\n\n\n<li class=\"ext-animate--on\">potential impacts on people, nature, water, air, climate, landscape and cultural heritage,<\/li>\n\n\n\n<li class=\"ext-animate--on\">information on protected areas, including Natura 2000 sites,<\/li>\n\n\n\n<li class=\"ext-animate--on\">potential cumulative impacts with other projects,<\/li>\n\n\n\n<li class=\"ext-animate--on\">the risk of a major accident, natural disaster or construction disaster,<\/li>\n\n\n\n<li class=\"ext-animate--on\">an analysis of project alternatives, where their consideration is justified,<\/li>\n\n\n\n<li class=\"ext-animate--on\">information on planned demolition works.<\/li>\n<\/ul>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">The scope and level of detail of the information should be tailored to the nature of the investment. A warehouse facility requires a different approach than a waste processing installation, and a port, hydrotechnical or energy project requires yet another.<\/p>\n\n\n\n<h2 class=\"wp-block-heading ext-animate--on\">Why does the quality of a KIP matter for the project schedule?<\/h2>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">One of the common reasons for delays in the procedure is inconsistent or overly general documentation. If the project parameters presented in the technical description, calculations, maps and appendices are not consistent, the authority may require the investor to provide additional explanations or supplement the documentation.<\/p>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">Problems may also arise when the KIP:<\/p>\n\n\n\n<ul class=\"wp-block-list ext-animate--on\">\n<li class=\"ext-animate--on\">does not define the maximum parameters of the investment,<\/li>\n\n\n\n<li class=\"ext-animate--on\">omits part of the associated infrastructure,<\/li>\n\n\n\n<li class=\"ext-animate--on\">does not present reliable emission, wastewater or waste calculations,<\/li>\n\n\n\n<li class=\"ext-animate--on\">insufficiently assesses environmental and water-related conditions,<\/li>\n\n\n\n<li class=\"ext-animate--on\">does not analyse cumulative impacts,<\/li>\n\n\n\n<li class=\"ext-animate--on\">uses general declarations instead of specific mitigation measures,<\/li>\n\n\n\n<li class=\"ext-animate--on\">contains information that does not reflect the current project concept.<\/li>\n<\/ul>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">Each request to supplement the documentation means additional work and often also the need to re-coordinate the data with designers or technologists. Organising the project assumptions at an early stage helps reduce this risk and makes the environmental procedure more efficient.<\/p>\n\n\n\n<h2 class=\"wp-block-heading ext-animate--on\">KIP and the Environmental Impact Assessment Report<\/h2>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">The Project Information Sheet and the Environmental Impact Assessment Report serve different purposes. The KIP provides the authority with the information required to carry out the so-called screening procedure, i.e. to determine whether a full environmental impact assessment is necessary for a particular project.<\/p>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">The EIA Report is a much more detailed study. It is prepared for projects that may always have a significant impact on the environment, as well as in cases where the authority requires an environmental impact assessment after reviewing the KIP and the specific circumstances of the project.<\/p>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">Submitting a Project Information Sheet therefore does not guarantee that an EIA Report will not be required. However, a carefully prepared KIP enables the authority to make its decision based on complete and verifiable information, without repeatedly requesting additional explanations or supplementary documentation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading ext-animate--on\">How should an investment project be prepared for the development of a KIP?<\/h2>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">Before starting work on the Project Information Sheet, it is advisable to gather:<\/p>\n\n\n\n<ul class=\"wp-block-list ext-animate--on\">\n<li class=\"ext-animate--on\">a description of the project concept and the planned technological process,<\/li>\n\n\n\n<li class=\"ext-animate--on\">design parameters of the proposed buildings, structures and equipment,<\/li>\n\n\n\n<li class=\"ext-animate--on\">a site development plan or a clear site layout concept,<\/li>\n\n\n\n<li class=\"ext-animate--on\">plot numbers and information concerning the investment site,<\/li>\n\n\n\n<li class=\"ext-animate--on\">expected demand for utilities,<\/li>\n\n\n\n<li class=\"ext-animate--on\">material, water, wastewater, emission and waste balances,<\/li>\n\n\n\n<li class=\"ext-animate--on\">information on transport and traffic management,<\/li>\n\n\n\n<li class=\"ext-animate--on\">information on the surroundings of the investment and nearby developments,<\/li>\n\n\n\n<li class=\"ext-animate--on\">previous decisions, permits and available environmental studies.<\/li>\n<\/ul>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">Not all data need to be final from the outset. However, they should provide a coherent and realistic basis for assessing the maximum potential impact of the project.<\/p>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">It is advisable to involve designers, technologists and those responsible for project implementation in the preparation of the data. This helps avoid inconsistencies between the KIP and the technical documentation and reduces the risk of subsequent changes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading ext-animate--on\">MASAD support in preparing a KIP<\/h2>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">MASAD supports investors from the initial classification of the project, through data collection and coordination with designers, all the way to <a href=\"https:\/\/masad.pl\/en\/kip-dokumentacja-srodowiskowa\/\">preparation of complete documentation<\/a> and support throughout the administrative procedure.<\/p>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">The scope of our support may include:<\/p>\n\n\n\n<ul class=\"wp-block-list ext-animate--on\">\n<li class=\"ext-animate--on\">classification of the project in accordance with applicable regulations,<\/li>\n\n\n\n<li class=\"ext-animate--on\">analysis of the location and existing environmental constraints,<\/li>\n\n\n\n<li class=\"ext-animate--on\">preparation of the Project Information Sheet (KIP),<\/li>\n\n\n\n<li class=\"ext-animate--on\">preparation of maps, calculations and required attachments,<\/li>\n\n\n\n<li class=\"ext-animate--on\">coordination of specialist and environmental analyses,<\/li>\n\n\n\n<li class=\"ext-animate--on\">preparation of responses to requests from the competent authority and updates to the documentation,<\/li>\n\n\n\n<li class=\"ext-animate--on\">further support if an Environmental Impact Assessment (EIA) Report is required.<\/li>\n<\/ul>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">The earlier environmental considerations are incorporated into the design process, the easier it is to reduce the risk of costly changes, additional analyses and delays in project implementation.<\/p>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">Do you need a Project Information Sheet (KIP) for your investment? <a href=\"https:\/\/masad.pl\/en\/kip-dokumentacja-srodowiskowa\/\" data-type=\"page\" data-id=\"541\">See the scope of our service and contact us.<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading ext-animate--on\">Planning an investment?<\/h2>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">Contact us before submitting your application. We will assess whether the planned project requires an environmental decision, determine the necessary scope of documentation and propose an appropriate approach to the administrative procedure.<\/p>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">Early consultation helps identify potential environmental constraints, organise project data and reduce the risk of delays at later stages of project implementation.<\/p>\n\n\n\n<div class=\"wp-block-buttons ext-animate--on is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-c0bc9f7e wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button masad-button\"><a class=\"wp-block-button__link has-text-color has-background has-link-color wp-element-button\" href=\"https:\/\/masad.pl\/en\/kontakt\/\" style=\"color:#ffffff;background-color:#2f6b57\">Discuss Your Project<\/a><\/div>\n<\/div>\n\n\n\n<p class=\"ext-animate--on wp-block-paragraph\">Would you like to provide the project details for an initial quotation? Go to our enquiry and quotation form.<\/p>\n\n\n\n<div class=\"wp-block-buttons ext-animate--on is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-c0bc9f7e wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-text-color has-background has-link-color wp-element-button\" href=\"https:\/\/forms.cloud.microsoft\/Pages\/ResponsePage.aspx?id=kv6wqa512EiJZxIiBSWalTP5pwTPDkxFhyMEuuRDipdUOVpWTkdJUEUyWTVXMkU3T1BIRFpHMDZMVS4u\" style=\"color:#ffffff;background-color:#2f6b57\" target=\"_blank\" rel=\"noopener\">Go to the quotation form<\/a><\/div>\n<\/div>\n\n\n\n<p class=\"ext-animate--on has-text-color has-link-color wp-elements-1 wp-block-paragraph\" style=\"color:#ffffff\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Karta informacyjna przedsi\u0119wzi\u0119cia jest jednym z najwa\u017cniejszych dokument\u00f3w na pocz\u0105tkowym etapie procesu inwestycyjnego. To na jej podstawie organ ocenia, czy planowane przedsi\u0119wzi\u0119cie wymaga przeprowadzenia pe\u0142nej oceny oddzia\u0142ywania na \u015brodowisko i sporz\u0105dzenia raportu OO\u015a. Dobrze przygotowana KIP mo\u017ce ograniczy\u0107 ryzyko wezwa\u0144 do uzupe\u0142nienia dokumentacji, op\u00f3\u017anie\u0144 oraz zmian harmonogramu inwestycji. Je\u017celi potrzebujesz przygotowania Karty Informacyjnej Przedsi\u0119wzi\u0119cia dla [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":389,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[11],"tags":[],"class_list":["post-51","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ochrona-srodowiska"],"_links":{"self":[{"href":"https:\/\/masad.pl\/en\/wp-json\/wp\/v2\/posts\/51","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/masad.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/masad.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/masad.pl\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/masad.pl\/en\/wp-json\/wp\/v2\/comments?post=51"}],"version-history":[{"count":9,"href":"https:\/\/masad.pl\/en\/wp-json\/wp\/v2\/posts\/51\/revisions"}],"predecessor-version":[{"id":695,"href":"https:\/\/masad.pl\/en\/wp-json\/wp\/v2\/posts\/51\/revisions\/695"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/masad.pl\/en\/wp-json\/wp\/v2\/media\/389"}],"wp:attachment":[{"href":"https:\/\/masad.pl\/en\/wp-json\/wp\/v2\/media?parent=51"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/masad.pl\/en\/wp-json\/wp\/v2\/categories?post=51"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/masad.pl\/en\/wp-json\/wp\/v2\/tags?post=51"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}